$ Costs

 


    

 Energy Cost Savings:

For every 1-BTU of electricity to operate compressor and pumps . . . 4 to 5 BTUs are extracted from the earth.
Heating COPs range from 4.0 to 5.0+
Cooling EERs range from 20 to 30.0

 

 

Construction Costs:

Drilling costs can range from $4000 to $5000 per bore depending on design.
Other loop types can reduce loop costs by 30% to 50%.
Geo equipment costs are equivalent to mid range efficiency conventional equipment, with the lowest life cycle cost of all.

 