$ Costs
 

Energy Cost Savings:
For every 1-BTU of electricity to operate compressor and pumps . . . 4
to 5 BTUs are extracted from the earth.
Heating COPs range from 4.0 to 5.0+
Cooling EERs range from 20 to 30.0
Construction Costs:
Drilling costs can range from $4000 to $5000 per bore depending on design.
Other loop types can reduce loop costs by 30% to 50%.
Geo equipment costs are equivalent to mid range efficiency conventional equipment, with the lowest life cycle cost of all.
For more information please contact us.
Email: info@BestWaterAir.com
Phone: (805)
543-4717 - Toll Free: (800) 796-6364 - Fax: (805) 782-0951

|